Real-Options Valuation of Rooftop Solar Investment for Small Manufacturing Enterprises Under Electricity-Tariff Uncertainty

Authors

  • Rafael Augusto Bertoldi Department of Economics and International Relations, Federal University of Santa Catarina (UFSC), Florianópolis, Brazil Author
  • Juliana Cristina Moreira Department of Economics and International Relations, Federal University of Santa Catarina (UFSC), Florianópolis, Brazil Author

Keywords:

Real options, rooftop solar, small and medium-sized enterprises, investment timing, electricity tariffs, least-squares Monte Carlo, energy policy

Abstract

Rooftop solar photovoltaic (PV) systems can reduce the electricity costs of small manufacturing enterprises, yet many enterprises postpone investment even when the net present value (NPV) is positive. This study explains such behaviour with a real-options model in which an enterprise can defer a 250 kWp rooftop PV investment for up to six years while electricity tariffs follow a stochastic process and capital costs decline. The option is valued by least-squares Monte Carlo and compared with the perpetual-option benchmark of Dixit and Pindyck. Parameters are illustrative values for a mid-income economy. At a tariff of USD 0.09/kWh, the static NPV was USD 26.2 thousand, but the option to wait was worth USD 30.6 thousand, so immediate investment was not optimal. The value of waiting rose with tariff volatility and with the rate of capital-cost decline, and the tariff that triggers investment exceeded the NPV break-even tariff by a wide margin. A time-limited ('sunset') capital subsidy brought investment forward most strongly: 85 % of simulated paths invested by year 2, compared with 35 % under a permanent subsidy of the same size and 7 % at baseline. Concessional finance raised early investment to 14 %, whereas tariff stabilisation mainly reduced the share of enterprises that never invested within six years (0.2 % versus 9.8 %), because with less volatility the anticipated decline in capital costs dominated the timing decision. The results imply that uncertainty about tariffs and expectations of falling costs are rational reasons for delay, and that policies should reward early action rather than only raise project returns. 

Downloads

Published

2026-10-31